3.4      Project preparation cir

The model is a circular waveguide excited with a fundamental TE11 mode (red transmission line port) and terminated with a load port (green transmission line port) matched to the waveguide. The waveguide is filled with air.

 

The project creation process can be divided into several steps:

·        New project

·        Defining the type of the structure and background medium

·        Drawing the structure

·        Drawing the ports

·        Setting boundary conditions

·        Setting up the mesh

·        Exporting the project and running the simulation